Design & Optimisation
- Layout planning and slotting optimisation
- Space utilisation audit and redesign
- Greenfield and brownfield project design
- 3D simulation and CAD-based planning
- Throughput and flow modelling
With warehouse rental costs steadily rising, the smarter question may not be "How much more space do I need?" — but "How much more can I get from the space I already have?"
Our solutions help you unlock more capacity and throughput from your existing warehouse — without adding more square feet.
And if you're considering a new warehouse, talk to us. We can help you optimise the space, capacity and throughput from the very beginning.
We cover the whole floor — from the layout drawing through to the racking, the trucks that move the pallets, the pallets themselves, and the power, air and safety systems around them.
Layout, flow, slotting and the racking that holds it all up.
ExploreForklifts, movers, conveyors, automation and the people to run them.
ExploreManufacture, pooling, RFID tracking, crates and returnable systems.
ExploreDocks, energy, HVLS air movement, safety and facility equipment.
ExploreDesign, optimise and digitise warehouses.
Move materials smarter, safer and greener.
End-to-end pallet and storage solutions.
Power, air, access and safety for warehouses.
Sectors where storage profile, handling rules and throughput patterns differ enough that a generic warehouse layout will underperform.
High turnover, dense pick faces, seasonal peaks that expose slotting weaknesses.
Batch traceability, controlled conditions and audit requirements shape the layout.
Piece picking, high SKU counts and returns volumes that conventional racking ignores.
Three stages, in order. Each one is only worth doing because the next one follows it.
We measure before we recommend. Volumes, SKU profile, pick lines, dwell times and seasonality — then a layout drawn against that data rather than against convention.
Slotting, flow, equipment and labour tuned together. Changing one without the others moves the bottleneck rather than removing it.
The gains have to keep arriving. We leave behind the measurement discipline, the AMC cover and the operator training, so each cycle improves on the one before it.
Whether it is a greenfield build, a site running out of room, or an operation that has quietly slowed down — start with a conversation.
info@insidebox.in